HUBER+SUHNER Wire & Cable

Results: 2.628
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS Wire Gauge - AWG Cable Length Voltage Rating Number of Conductors Packaging
HUBER+SUHNER RF Cable Assemblies Semi-rigid, 50 Ohm, 40 GHz, 125 C, 2.95 mm, Copper/Tin plated
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER RF Cable Assemblies Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Copper, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER RF Cable Assemblies Semi-rigid, 50 Ohm, 18 GHz, 100 C, 6.35 mm, Copper/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER RF Cable Assemblies Semi-rigid, 50 Ohm, 107 GHz, 100 C, 1.19 mm, Copper, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 40 GHz, 125 C, 2.2 mm, Copper, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 40 GHz, 125 C, 2.2 mm, Copper/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 40 GHz, 125 C, 2.2 mm, Aluminium/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 40 GHz, 125 C, 2.2 mm, Copper/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Aluminium/Tin plated, M17
Drop Dispatch Lead Time 4 Weeks
Min.: 150
Mult.: 150
2 m (6.562 ft) 1.9 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Aluminium/Tin plated, M17
Drop Dispatch Lead Time 4 Weeks
Min.: 30
Mult.: 30
3 m (9.843 ft) 1.9 kV
HUBER+SUHNER RF Cable Assemblies Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Aluminium/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER RF Cable Assemblies Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Copper/Tin plated
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER RF Cable Assemblies Semi-rigid, 50 Ohm, 107 GHz, 100 C, 1.19 mm, Copper/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152

HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 40 GHz, 125 C, 2.2 mm, Aluminium/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
2 m (6.562 ft) 1.5 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 40 GHz, 125 C, 2.95 mm, Copper/Tin plated
Drop Dispatch Lead Time 10 Weeks
Min.: 30
Mult.: 30
3 m (9.843 ft) 1.2 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Copper/Tin plated
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
2 m (6.562 ft) 1.9 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Copper/Tin plated
Drop Dispatch Lead Time 4 Weeks
Min.: 30
Mult.: 30
3 m (9.843 ft) 1.9 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Copper, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
2 m (6.562 ft) 1.9 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Copper, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
3 m (9.843 ft) 1.9 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 33 GHz, 125 C, 3.58 mm, Copper/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
2 m (6.562 ft) 1.9 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 18 GHz, 100 C, 6.35 mm, Copper, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
2 m (6.562 ft) 3 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 18 GHz, 100 C, 6.35 mm, Copper, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
3 m (9.843 ft) 3 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 18 GHz, 100 C, 6.35 mm, Copper/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 150
Mult.: 150
2 m (6.562 ft) 3 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 18 GHz, 100 C, 6.35 mm, Copper/Tin plated, M17
Drop Dispatch Lead Time 10 Weeks
Min.: 30
Mult.: 30
3 m (9.843 ft) 3 kV
HUBER+SUHNER Coaxial Cables Semi-rigid, 50 Ohm, 107 GHz, 100 C, 1.19 mm, Copper/Silver plated
Drop Dispatch Lead Time 10 Weeks
Min.: 152
Mult.: 152
1 kV